A groundbreaking ceremony was held for the 100-megawatt supportable grid-connected wind power project in Basu County, Xizang, with an altitude of 5300 meters.

On April 2, a groundbreaking ceremony was held for the 100-megawatt supportable grid-connected wind power project in Basu County, Xizang, designed and undertaken by Power Construction China. The project has an altitude of 5300 meters, setting a new record for the previous Tibet Cuomezhegu Wind Farm, the world's highest altitude of 5200 meters. Wind farm record.

The 100MW supportable grid-connected wind power project in Basu County, Xizang, is located in Bangda Town, Basu County. The generating units are arranged on continuous ridges. The base altitude of the project's wind turbine reaches 5190 meters, the maximum altitude of the plant area is 5200 meters, and the cabin installation location reaches 5300 meters. It is designed by the Beijing Institute of Power Construction of China and the general contract of the 10th Hydropower Bureau.

The project has an installed capacity of 100 MW and consists of 20 wind turbines with a single unit capacity of 5 MW. It is currently the highest wind power project in the world and the largest wind power project under construction in Xizang. The project also includes a 110 kV booster station to provide stable and efficient wind power energy.

The project is located in a plateau monsoon climate, geographically characterized by high mountains and deep valleys, and rich wind resources. After construction and commissioning, it is expected that about 236 million kilowatt-hours of green electricity can be produced every year, saving 70,000 tons of standard coal and reducing carbon dioxide emissions by about 190,000 tons. It can not only effectively supplement the energy supply of Tibet Autonomous Region, but also as green electricity, it will help alleviate the environmental protection pressure of the local power industry and play a positive role in driving the rapid development of the regional economy.

In recent years, Xizang has ushered in great development of wind power. A number of wind power projects in ultra-high altitude areas undertaken by power construction, such as the Zhegu Wind Power Project in Cuomei County and the Omatinga 100-MW Wind Power Project in Nagqu Seni District, have been successfully put into operation, providing strong support for the research and application of ultra-high altitude and low-temperature freeze-resistant wind turbines in plateau areas.

author-gravatar

Author: Emma

An experienced news writer, focusing on in-depth reporting and analysis in the fields of economics, military, technology, and warfare. With over 20 years of rich experience in news reporting and editing, he has set foot in various global hotspots and witnessed many major events firsthand. His works have been widely acclaimed and have won numerous awards.

This post has 5 comments:

Leave a comment: